Application of Analysis of Variance Method in Evaluating Construction Project Cost Performance: A Case Study of the Ministry of Finance Apartment Complex in Jayapura

Authors

  • Erwin Erwin Universitas Cenderawasih

DOI:

https://doi.org/10.58812/wsis.v2i12.2229

Keywords:

Project, Control, Variant Analysis, Finance Apartment Complex, Jayapura

Abstract

In a stage of project implementation, there are problems that can cause a project to experience cost overruns so that it can cause losses. Seeing from the problems found to get maximum results with good quality and quality of work, it is necessary to evaluate and control costs on project profits as a whole. During the construction of the Jayapura Ministry of Finance flat project, there were 5 addendums when the structural work was carried out starting from January to August. These changes have a major impact on the overall time and cost of a project and have a direct and indirect adverse impact. The method used in a control is the Variant Analysis method. Control aims to be able to find out the cost of the most dominant variant during the working period. This method will show the difference between the implementation cost and the budget. The application of this variant analysis method is only in the work of the structure of the flats of the Ministry of Finance of Jayapura from January to August. Based on the analysis using the Variance Analysis method, the most dominant cost variance occurs in the 2nd floor work item with a variance value - RP. 58,239,966.11 then in the lower structure work with a variance value - RP. 46,060,221.40 and in the 3rd floor work with a variance value - Rp. 36,434,137.98.

References

[1] A. Blongkod, “PERENCANAAN DAN PENGENDALIAN BIAYA DAN WAKTU PELAKSANAAN PEKERJAAN PROYEK RUKO SENTRA SUMOMPO.” Politeknik Negeri Manado, 2016.

[2] A. Pratama and H. Taufik, “Analisis Percepatan Terhadap Waktu Proyek (Study kasus: Kantor Dinas SKPD Gedung B3 di Tenayan Raya).” Riau University, 2016.

[3] A. Masyruroh and I. Rahmawati, “MANAJEMEN PROYEK RUMAH SAKIT,” 2021.

[4] A. R. Ekanugraha, “Evaluasi pelaksanaan proyek dengan metode cpm dan pert (studi kasus pembangunan terminal binuang baru kec. Binuang).” UII, 2016.

[5] K. HIDAYAT HARAHAP, “ANALISIS PENGARUH WAKTU PELAKSANAAN PEKERJAAN DENGAN MENGGUNAKAN METODE PDM DAN PERT (Studi Kasus Pembangunan Rumah Dr. Richard Lee, MARS, AAM).” 021008 UNIVERSITAS TRIDINANTI PALEMBANG, 2022.

[6] A. Dwiretnani, E. Handayani, and N. Saputra, “Evaluasi Penjadwalan Waktu Proyek Pembangunan Gedung Menggunakan Critical Path Method (CPM),” J. Talent. Sipil, vol. 6, no. 2, pp. 391–400, 2023.

[7] D. Malaiholo, M. A. Kurniawan, and N. Anggraini, “Analisa Pengendalian Biaya Dan Waktu Pada Pelaksanaan Proyek (Studi Kasus: Jalur Ganda Kereta Api Mojokerto-Jombang),” J. Talent. Sipil, vol. 5, no. 1, pp. 49–54, 2022.

[8] R. Wospoga and N. Wardhani, “Analisa Pembiayaan Proyek Pembangunan Lanjutan Gedung Laboratorium Terpadu Fkip Universitas Tanjungpura Pontianak,” JeLAST J. Tek. Kelautan, PWK, Sipil, dan Tambang, vol. 2, no. 2, 2015.

Downloads

Published

2024-12-31

How to Cite

Application of Analysis of Variance Method in Evaluating Construction Project Cost Performance: A Case Study of the Ministry of Finance Apartment Complex in Jayapura (E. Erwin , Trans.). (2024). West Science Interdisciplinary Studies, 2(12), 2544-2552. https://doi.org/10.58812/wsis.v2i12.2229