Evaluation of Production Capability of Transportation Equipment and Loading Equipment in Limestone Mining at PT X, South Sulawesi

Authors

  • Muhammad Tri Aditya Politeknik Negeri Malang
  • Deni Putra Arystianto Politeknik Negeri Malang
  • Harsalim Aimunandar Jayaputra Politeknik Negeri Malang
  • Helik Susilo Politeknik Negeri Malang
  • Gindang Rain Pratama Politeknik Negeri Malang

DOI:

https://doi.org/10.58812/wsis.v2i12.1505

Keywords:

Production, Limestone, Efficiency, Mining Equipment

Abstract

This study focuses on the evaluation of the production capacity of loading and hauling equipment in limestone mining operations at PT. X, South Sulawesi Province. The selection of this topic is based on the importance of operational efficiency in limestone mining which has a direct impact on the productivity and sustainability of the cement industry. The main objectives of this study are to determine the actual production of loading and hauling equipment, determine the number of equipment needed to meet production targets and identify compatibility factors between mechanical equipment at the mining site. The methods used include field data collection involving measurement of cycle time and production capacity of loading and hauling equipment. The data obtained are then processed using statistical methods to ensure the accuracy of the results. Data analysis is carried out by considering variables such as work efficiency, cycle time, and equipment capacity. The results show that Kobelco SK 480 LC has the highest production capacity (509.34 tons/hour), followed by Komatsu PC 400 (448.25 tons/hour) and PC 300 (417.05 tons/hour). To achieve the Crusher production target of 1450 tons/hour, a combination of loading equipment and dump trucks with a compatibility factor between 0.87 and 0.92 is required, indicating potential for increased efficiency. It is recommended to improve maintenance of equipment and mining roads to optimize productivity.

References

S. Caserini, N. Storni, and M. Grosso, “The Availability of Limestone and Other Raw Materials for Ocean Alkalinity Enhancement,” Global Biogeochem. Cycles, vol. 36, no. 5, 2022, doi: 10.1029/2021GB007246.

J. Tanijaya, S. Tappi, and Jabair, “The mechanical properties of limestone as an aggregate on high strength concrete,” IOP Conf. Ser. Mater. Sci. Eng., vol. 1088, no. 1, p. 012098, 2021, doi: 10.1088/1757-899x/1088/1/012098.

Serena De Marco, Accelerating Climate Action a Just T Ransition I N a Post-Covi D Era. 2021. [Online]. Available: www.sisclima.it

F. Doulati Ardejani et al., “Developing a Conceptual Framework of Green Mining Strategy in Coal Mines: Integrating Socio-economic, Health, and Environmental Factors,” J. Min. Environ., vol. 13, no. 1, pp. 101–115, 2022, doi: 10.22044/jme.2022.11704.2161.

P. C. Mishra, R. R. Panigrahi, and A. K. Shrivastava, “Geo-environmental factors’ influence on mining operation: an indirect effect of managerial factors,” Environ. Dev. Sustain., vol. 26, no. 6, pp. 14639–14663, 2024, doi: 10.1007/s10668-023-03211-2.

M. Shamsi, Y. Pourrahimian, and M. Rahmanpour, “Optimisation of open-pit mine production scheduling considering optimum transportation system between truck haulage and semi-mobile in-pit crushing and conveying,” Int. J. Mining, Reclam. Environ., vol. 36, no. 2, pp. 142–158, Feb. 2022, doi: 10.1080/17480930.2021.1996983.

W. A. Hustrulid and R. C. Bullock, Underground mining methods : engineering fundamentals and international case studies. Society for Mining, Metallurgy, and Exploration, 2001. Accessed: Dec. 11, 2024. [Online]. Available: https://cir.nii.ac.jp/crid/1130000797122027776.bib?lang=en

B. K. George, B. Nojabaei, E. C. Westman, and M. J. Barros-Daza, “Optimization of Quarry Operations and Maintenance Schedules,” 2023.

“ANALYZING THE SOURCES AND IMPACT OF HUMAN ERRORS IN OPERATION AND MAINTENANCE OF MINING Co-supervisor : Prof . K Gupta,” vol. 0002, no. August, 2017.

E. A. Pasco, “Equipment Management Towards Sustainable Mining. Thesis submitted to McGill University,” no. May, 2020.

P. Penambangan, E. Pit, T. Pt, M. Soputan, and A. H. Thambas, “Kajian Teknis Efisiensi Pengangkutan Dengan ( Articulated Dump Truck ) ADT VOLVO A40F Terhadap Produksi Excavator Volvo EC-750DL,” vol. 22, no. 89, 2024.

K. Hinkelmann, “Design and Analysis of Experiments,” Des. Anal. Exp., vol. 3, pp. 1–566, 2012, doi: 10.1002/9781118147634.

M. T. Aditya, H. Susilo, and Y. Fanani, “Analysis of Decreased Limestone Production on the Effect of Rainfall with the Linear Regression Method,” vol. 01, no. 10, pp. 1092–1101, 2023.

A. A. Firoozi, M. Tshambane, A. A. Firoozi, and S. M. Sheikh, “Strategic load management: Enhancing eco-efficiency in mining operations through automated technologies,” Results Eng., vol. 24, no. September, p. 102890, 2024, doi: 10.1016/j.rineng.2024.102890.

H. Ganapathi and M. Phukan, “Environmental Hazards of Limestone Mining and Adaptive Practices for Environment Management Plan BT - Environmental Processes and Management: Tools and Practices,” R. M. Singh, P. Shukla, and P. Singh, Eds. Cham: Springer International Publishing, 2020, pp. 121–134. doi: 10.1007/978-3-030-38152-3_8.

U. C. Mishra, S. Sarsaiya, and A. Gupta, “A systematic review on the impact of cement industries on the natural environment,” Environ. Sci. Pollut. Res., vol. 29, no. 13, pp. 18440–18451, 2022, doi: 10.1007/s11356-022-18672-7.

M. Schneider, “The cement industry on the way to a low-carbon future,” Cem. Concr. Res., vol. 124, p. 105792, 2019, doi: https://doi.org/10.1016/j.cemconres.2019.105792.

Downloads

Published

2024-12-31

How to Cite

Evaluation of Production Capability of Transportation Equipment and Loading Equipment in Limestone Mining at PT X, South Sulawesi (M. T. Aditya, D. P. Arystianto, H. A. Jayaputra, H. Susilo, & G. R. Pratama , Trans.). (2024). West Science Interdisciplinary Studies, 2(12), 2318-2325. https://doi.org/10.58812/wsis.v2i12.1505